Roadworks around Shepherd's Bush
Where to expect traffic delays in the days ahead
| A4020 Uxbridge Road, London, Hammersmith and Fulham |
| 18 February — 01 April |
| Delays likely Traffic control (two-way signals) |
| Works location: Unknown |
| Works description: MAJOR LARGE DIAMETER MAINS ABANDONMENT ABANDON 501M OF 24" GAS MAIN |
| Responsibility for works: Cadent |
| Current status: Planned work about to start |
| Works reference: AZ0071000802012 |
|
|
| A402 Goldhawk Road, London, Hammersmith and Fulham |
| 20 February — 20 February |
| Delays likely Lane closure |
| Works location: Unknown |
| Works description: SAHARA SURVEY FOR LEAK DETECTION. NO EXCAVATION, CHAMBER OPENING ONLY. |
| Responsibility for works: THAMES WATER |
| Current status: Planned work about to start |
| Works reference: MU600CHB3003-4 |
|
| B408 Askew Road, London, Hammersmith and Fulham |
| 18 February — 18 February |
| Delays likely Contra-flow |
| Works location: Unknown |
| Works description: Minor, non excavation works. Contraflow system to be installed with all chapter 8 signage, cones and barriers. Cherry picker to access telecoms antenna for testing / maintenance works. |
| Responsibility for works: Vodafone |
| Current status: Planned work about to start |
| Works reference: NX11578978/ERI/STM/KS |
| |
|
| A219 Wood Lane, London, Hammersmith and Fulham |
| 15 February — 15 March |
| Delays likely Traffic control (two-way signals) |
| Works location: Unknown |
| Works description: NEW WASTE WATER AND SEWER CONNECTION, WORKS IN THE FOOTWAY AND CARRIAGEWAY |
| Responsibility for works: THAMES WATER |
| Current status: Advanced planning |
| Works reference: MU30700050103887-W001 |
|
| Bentworth Road, London, Hammersmith and Fulham |
| 15 February — 19 February |
| Delays possible Some carriageway incursion |
| Works location: Unknown |
| Works description: B Box Install <33mm Fway in Footway. Our intention is to completethe Permanent Reinstatement in the same phase |
| Responsibility for works: THAMES WATER |
| Current status: Planned work about to start |
| Works reference: MU301000031236451-001 |
Information supplied by roadworks.org
February 18, 2019
|