Roadworks in the Hammersmith Area
Where to expect traffic delays in the days ahead
Roadworks |
| A219 Shepherd'S Bush Road, London, Hammersmith And Fulham |
| 31 October — 31 October |
| Delays likely Traffic control (give & take) |
| Works location: A219 |
| Works description: Maintenance Of Flow Meters In Manholes, Out Of Hours, Working For Optimise |
| Responsibility for works: Thames Water |
| Current status: Planned work about to start |
|
|
| A219 Shepherd'S Bush Road, London, Hammersmith And Fulham |
| 31 October — 04 November |
| Delays likely Traffic control (give & take) |
| Works location: A219 |
| Works description: Perm Reinstatement In The Carriageway |
| Responsibility for works: Thames Water |
| Current status: Planned work about to start |
|
|
| A3220 Holland Road, London, Kensington And Chelsea |
| 31 October — 01 November |
| Delays likely Lane closure |
| Works location: A3220 |
| Works description: Maintanence - Cracked Cw Area Around Metal Cover In Loading Bay Lane 1 |
| Responsibility for works: Transport For London |
| Current status: Planned work about to start |
|
|
| A315 Kensington High Street, London, Kensington And Chelsea |
| 31 October — 04 November |
| Delays possible Some carriageway incursion |
| Works location: A315 |
| Works description: Remedial Works Following Defect Inspection - To Replace Chipped Slab No Tm Required |
| Responsibility for works: National Grid Gas Plc |
| Current status: Planned work about to start |
|
|
| Edith Villas, London, Hammersmith And Fulham |
| 31 October — 04 November |
| Delays possible Some carriageway incursion |
| Works location: - |
| Works description: - |
| Responsibility for works: UK Power Networks |
| Current status: Planned work about to start |
|
Information supplied by Roadworks.org
|