Where to expect delays and closures in days ahead

Hammersmith Bridge is closed to vehicular traffic for the foreseeable future.
|
A3218 Lillie Road, Fulham
06 May — 06 May
Delays likely - Traffic control (Stop/Go boards)
Works description : Thames Water need to carry out works on the water valve. Stop & Go boards will be installed to allow these works to be carried out. Minor Works, No Excavation.
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU150WO-24581889/TW |
|
A3218 Lillie Road, Fulham
07 May — 07 May
Delays likely - Traffic control (Stop/Go boards)
Works description : Thames Water need to carry out works on the water valve. Stop & Go boards will be installed to allow these works to be carried out. Minor Works, No Excavation.
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU150WO-24582023/TW |
|
A3220 Gunter Grove
07 May — 09 May
Delays likely - Road closure
Works description : Phase 12 Junction Improvement works
Responsibility for works: Transport for London
Current status: Advanced planning
Works reference: YG432407187 |
|
Tadema Road
07 May — 09 May
Delays likely - Road closure
Works description : Phase 12 Junction Improvement works
Responsibility for works: Transport for London
Current status: Advanced planning
Works reference: YG432407186 |
A308,A3217 King's Road
03 April — 01 July
Delays likely - Traffic control (two-way signals)
Works description: CISBOT Internal Mains Sealing long cycle phase 5
Responsibility for works: Cadent
Current status: Planned work about to start
Works reference: AZ0071000883597