| Upcoming Roadworks in Fulham |
Where to expect delays and closures in days ahead
Hammersmith Bridge is closed to vehicular traffic for the foreseeable future. A304 Fulham Road, London, Hammersmith and Fulham 18 April — 19 April Delays likely - Traffic control (two-way signals) Works location: Unknown Works description: Fire Hydrant Repack Gland IN in Footway. Our intention is to completethe Permanent Reinstatement in the same phase Responsibility for works: THAMES WATER Current status: Planned work about to start Works reference: MU289000031399879-002 A219 Fulham Palace Road, London, Hammersmith and Fulham 17 April — 23 April Delays likely - Traffic control (give & take) Works location: Unknown Works description: LAY 2 NEW GAS SERVICES TO 185 FULHAM PALACE ROAD FROM THE MAIN Responsibility for works: Cadent Current status: Planned work about to start Works reference: AZ0071000921354 Imperial Road, London, Hammersmith and Fulham 18 April — 18 May Delays possible - Some carriageway incursion Works location: Unknown Works description: Excavation to install electric ducts/cables to Fulham Gas Woorks new development. Responsibility for works: GAS TRANSPORTATION CO LTD Current status: Planned work about to start Works reference: ZP011P-0098107/R1
A308 New King's Road, London, Hammersmith and Fulham 07 April — 01 May A308,A3217 King's Road
Information supplied by one.network
|