Upcoming Roadworks in Fulham


Related links
Upcoming Roadworks in Fulham

Where to expect delays and closures in days ahead

Hammersmith Bridge is closed to vehicular traffic for the foreseeable future.

A304 Fulham Road, London, Hammersmith and Fulham

22 March — 22 March

Delays likely - Lane closure

Works location: Unknown

Works description: Connections Highway Services:Installation of a new electricity supply for a customer:Installation of a new electricity supply for a customer:WORKS ARE FOR NON ROAD PURPOSE AND UNBEHALF OF UNILED SOLUTIONS

Responsibility for works: UK POWER NETWORKS EASTERN & LONDON

Current status: Planned work about to start

Works reference: EC40010777515

A304 Fulham Road, London, Hammersmith and Fulham

23 March — 24 March

Delays possible - Some carriageway incursion

Works location: Unknown

Works description: Install 13m of 1 way poly duct in Footway,Provide 1 core drill(s) into jointbox or building

Responsibility for works: Openreach

Current status: Planned work about to start

Works reference: BC006TI001LC500294263104


Townmead Road, London, Hammersmith and Fulham

23 March — 31 March

Delays likely - Traffic control (two-way signals)

Works location: Unknown

Works description: Connections Projects:Electrical service alteration to customer supply:Excavation of joint holes for a new service connection 15-20 meters track work.

Responsibility for works: UK POWER NETWORKS EASTERN & LONDON

Current status: Planned work about to start

Works reference: EC40010774999

 

Greswell Street

19 March — 25 March

Delays possible - Some carriageway incursion

Works description: ALTER AND RELAY DOMESTIC SERVICE 1M FROM MAIN IN NEARSIDE FOOTWAY

Responsibility for works: Cadent

Current status: Planned work about to start

Works reference: AZ0071000919178

Harbour Avenue, Chelsea Harbour

21 March — 23 March

Delays possible - Traffic control (two-way signals)

Works description: Connections (Major conn.):Rectification of surface reinstatement:Permit for remedial works to repair defective c/w from previous instalcom works. two way lights to be used in conjunction with bus stop suspension.

Responsibility for works: UK POWER NETWORKS EASTERN & LONDON

Current status: Planned work about to start

Works reference: EC40010779906

 

Information supplied by  one.network