Where to expect delays and closures in days ahead

Hammersmith Bridge is closed to vehicular traffic for the foreseeable future.

Peterborough Road, London, Hammersmith and Fulham

03 March — 06 March

Delays likely - Traffic control (two-way signals)

Works location: Unknown

Works description: NHH 1x32mm BP mtrd sply FOR NEW WATER SUPPLY IN FW AND in Carriageway.Our intention is to complete the Permanent Reinstatement inthe samephase

Responsibility for works: THAMES WATER

Current status: Planned work about to start

Works reference: MU307000806907340135-002

 

A304 Fulham Road, London, Hammersmith and Fulham

01 March — 04 March

Delays likely - Traffic control (multi-way signals)

Works location: Unknown

Works description: SEW DESCALE EMERGENCY/REACTIVE

Responsibility for works: THAMES WATER

Current status: Planned work about to start

Works reference: MU026002141CXKD--000010

A308 New King's Road, London, Hammersmith and Fulham

29 February — 08 March

Delays likely - Traffic control (multi-way signals)

Works location: Unknown

Works description: Works in the footway and carriageway to replace St Thomas's Academy lead pipe water service from the main to boundary

Responsibility for works: THAMES WATER

Current status: Planned work about to start

Works reference: MU276IA/AMP6/SCH/HAM/014

 

B317 North End Road, London, Hammersmith and Fulham

24 February — 03 March

Delays possible - Some carriageway incursion

Works location: Unknown

Works description: removal of Harriet cabinet , installation of new lancaster base and cabinet , swap out existing telecoms pole for a new upgraded pole - to include all rigging and electrical work

Responsibility for works: O2 (UK) Limited

Current status: Planned work about to start

Works reference: MG01444567/CAP/POLE

B317 North End Road, London, Hammersmith and Fulham

29 February — 03 March

Delays possible - Some carriageway incursion

Works location: Unknown

Works description: Remedial works to correct defect, re-lay uneven blocks, re-do pointing

Responsibility for works: Openreach

Current status: Planned work about to start

Works reference: BC006TI001LC500290776002

A304 Fulham Road, London, Hammersmith and Fulham

28 February — 03 March

Delays likely - Traffic control (two-way signals)

Works location: Unknown

Works description: Install 13m of 1 way poly duct in Footway,Provide 1 core drill(s) into jointbox or building

Responsibility for works: Openreach

Current status: Planned work about to start

Works reference: BC006TI001LC500294263101

 