Where to expect delays and closures in days ahead  
        
            
    
     
      
            A3219 Dawes Road 
            19 October - 27 October  
            Delays likely - Traffic control (two-way signals)  
            Works location: Unknown Works description: Sewer reapirs in carriageway - Relating to collapsed pipework  
            Responsibility for works: THAMES WATER  
            Current status: Planned work about to start  
            Works reference: MU026002141HYGP--001001 
              
A219 Fulham Palace Road 
            20 October - 20 October  
            Delays likely - Contra-flow  
            Works location: Unknown  
            Works description: Network Operations Faults:Essential repair of electricity cables powering street lighting / furniture:Urgent Repairs to Street furniture. Lane closure required to allow for a walk way in the c/w to manage peds. 2 x bus stops to be suspended.  
            Responsibility for works: UK POWER NETWORKS EASTERN & LONDON  
            Current status: Planned work about to start  
            Works reference: EC40010760731 
        A3220 Edith Grove 
            15 October — 11 November 
  Delays likely - Lane closure 
  Works location: Unknown 
  Works description: Phase 1 Junction Improvement works 
  Responsibility for works: Transport for London 
  Current status: Advanced planning 
  Works reference: YG432406879 
            A3220,A3212 Cheyne Walk 
            15 October — 11 November 
  Delays likely - Lane closure 
  Works location: Unknown 
  Works description: Phase 1 Junction Improvement works Responsibility for works: Transport for London 
  Current status: Advanced planning 
  Works reference: YG432406916           
  
  
 Information supplied by  one.network 
              
October 4, 2019 
  
                     
        
 
       |