Upcoming Roadworks in Fulham


Where to expect delays and closures in days ahead

A308 New King's Road, Fulham
07 September — 22 September
Delays likely Traffic control (multi-way signals)
Works description: 1x32mm MDPE mtrd W/regs FOR NEW WATER SUPPLY IN FW AND in Carriageway.Our intention is to complete the Permanent Reinstatement in the samephase
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU307000808319320365-003
A304 Fulham Road, London, Hammersmith and Fulham
21 September — 22 September
Delays likely Traffic control (multi-way signals)
Works location: Unknown
Works description: 3 WAY TRAFFIC LIGHT SYSTEM WIH FOOTPATH CLOSEURE AND PEDESTRIAN WALKWAY TO LOCATE AND EXCAVATE EXISTING BT UNDERGROUND INFRASTRUCTURE TO CLEAR BLOCKAGES
Responsibility for works: Openreach
Current status: Planned work about to start
Works reference: BC005KN1W00000FULHM-NS01


 

A3219 Dawes Road, London, Hammersmith and Fulham
19 September — 19 September
Delays likely Traffic control (multi-way signals)
Works location: Unknown
Works description: S81 PLANNED COVER REPLACEMENT--WORKS INTENDED TO INCLUDE FIRST TIME PERMANENT REINSTATEMENT WITHIN SAME PHASE
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU026002141JKCM--000001
A3219 Munster Road, London, Hammersmith and Fulham
19 September — 19 September
Delays likely Traffic control (multi-way signals)
Works location: Unknown
Works description: S81 PLANNED COVER REPLACEMENT--WORKS INTENDED TO INCLUDE FIRST TIME PERMANENT REINSTATEMENT WITHIN SAME PHASE
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU026002141FJPM--000004

 

B317 North End Road, London, Hammersmith and Fulham
18 September — 20 September
Delays likely Traffic control (multi-way signals)
Works location: Unknown
Works description: 3 WAY TRAFFIC LIGHT SYSTEM WIH FOOTPATH CLOSURE AND PEDESTRIAN WALKWAY TO LOCATE AND EXCAVATE EXISTING BT UNDERGROUND INFRASTRUCTURE TO CLEAR BLOCKAGES
Responsibility for works: Openreach
Current status: Planned work about to start
Works reference: BC005KN1W00000FULHM-NS02


 

 

Information supplied by roadworks.org

Related links
Related Links

Roadworks sign

Live Travel News for Fulham