Where to expect delays and closures in days ahead
| B317 North End Road, London, Hammersmith and Fulham |
| 02 March — 03 March |
| Delays likely Traffic control (two-way signals) |
| Works location: Unknown |
| Works description: LAY DUCT IN CARRIAGEWAY TO CONNECT CLIENT |
| Responsibility for works: VIRGIN MEDIA |
| Current status: Planned work about to start |
| Works reference: NK100/SCLJBU/109120/LBA |
|
| B317 North End Road, London, Hammersmith and Fulham |
| 27 February — 05 March |
| Delays likely Lane closure |
| Works location: Unknown |
| Works description: IMGC190334 Lay 63mm Supply to basement of property with 2. steelthroughBasement and up to external Balcony for 3 point manifold.Connection to existing main in footway near side. |
| Responsibility for works: Cadent |
| Current status: Planned work about to start |
| Works reference: AZ0071000802863 |
| Imperial Road, London, Hammersmith and Fulham |
| 04 March — 13 March |
| Delays likely Traffic control (two-way signals) |
| Works location: Unknown |
| Works description: THIS PERMIT IS FOR THAMES WATER TO INSTALL A 300MM DISTRICT METER ON 300MM MAIN IN C/W AND F/W |
| Responsibility for works: THAMES WATER |
| Current status: Planned work about to start |
| Works reference: MU30700080110679M-004 |
|
| A217 Wandsworth Bridge Road, London, Hammersmith and Fulham |
| 18 February — 04 March |
| Delays likely Traffic control (Stop/Go boards) |
| Works location: Unknown |
| Works description: CONSTRUCTION OF A MINI PUMPING STATION (FLIP) IN THE FOOTWAY |
| Responsibility for works: THAMES WATER |
| Current status: Planned work about to start |
| Works reference: MU287MGJV/FLIPS/208656 |
|
| |
| A219 Fulham Palace Road, London, Hammersmith and Fulham |
| 18 February — 17 March |
| Delays likely Lane closure |
| Works location: Unknown |
| Works description: Connections Projects:Installation of a new electricity supply for a customer:Excavation to install x6 125mm ducts for 11kv cables x3 for future use and x3 for the site on Hammersmith Road, with backfill and reinstatement to HAUC spec |
| Responsibility for works: UK POWER NETWORKS EASTERN & LONDON |
| Current status: Planned work about to start |
| Works reference: EC40010757303 |
|
Information supplied by roadworks.org
|