A217 Wandsworth Bridge Road, London, Hammersmith And Fulham |
21 May — 22 May |
|
|
Delays likely Traffic control (two-way signals) |
|
Works location: A217 |
|
|
Works description: Repair To A Damaged Water Main In Carriageway. Our Intention Is Tocomplete The Permanent Reinstatement In The Same Phase |
|
|
Responsibility for works: Thames Water |
|
|
Current status: Planned work about to start |
|
|
|
|
A308 New King'S Road, London, Hammersmith And Fulham |
21 May — 22 May |
|
|
Delays likely Traffic control (two-way signals) |
|
Works location: A308 |
|
|
Works description: 1x25mm New Water Supply Connection, Footway And In Carriageway. Ourintention Is To Complete The Permanent Reinstatement In The Same Phase |
|
|
Responsibility for works: Thames Water |
|
|
Current status: Planned work about to start |
|
|
|
|
|
|
A217 Wandsworth Bridge Road, London, Hammersmith And Fulham |
21 May — 23 May |
|
|
Delays possible Some carriageway incursion |
|
Works location: A217 |
|
|
Works description: Connections Projects:New Supply Scheme: (Approx Depth 450mm-600mm):Installing A 100amp Three Phase Service |
|
|
Responsibility for works: UK Power Networks |
|
|
Current status: Planned work about to start |
|
|
|
|
A219 Fulham High Street, London, Hammersmith And Fulham |
20 May — 24 May |
|
|
Delays possible Some carriageway incursion |
|
Works location: A219 |
|
|
Works description: B Box Exchange In Footway. Our Intention Is To Complete The Permanentreinstatement In The Same Phase |
|
|
Responsibility for works: Thames Water |
|
|
Current status: Planned work about to start |
|
|
|
|
A304 Fulham Road, London, Hammersmith And Fulham |
20 May — 24 May |
|
|
Delays possible Some carriageway incursion |
|
Works location: A304 |
|
|
Works description: Fire Hydrant Standard Repair No Excav In Footway. Our Intention Is Tocomplete The Permanent Reinstatement In The Same Phase |
|
|
Responsibility for works: Thames Water |
|
|
Current status: Planned work about to start |
|
|
|
|
|
|
A3218 Lillie Road, London, Hammersmith And Fulham |
20 May — 20 May |
|
|
Delays possible Some carriageway incursion |
|
Works location: A3218 |
|
|
Works description: Could This Closed To Perm As It Looks Like It Was Done Under Permit Ref 895-Mgjv/Flips/93526 And Is Now Permanent (Remedial Reinstatement In C/W) |
|
|
Responsibility for works: Thames Water |
|
|
Current status: Planned work about to start |
|
|
|
|
A3218 Lillie Road, London, Hammersmith And Fulham |
20 May — 20 May |
|
|
Delays possible Some carriageway incursion |
|
Works location: A3218 |
|
|
Works description: Replace 1 Jointbox Frame And Cover(S) (625mm X 625mm) In Carriageway |
|
|
Responsibility for works: BT |
|
|
Current status: Planned work about to start |
|
|
|
|
A3218 Lillie Road, London, Hammersmith And Fulham |
21 May — 22 May |
|
|
Delays possible Some carriageway incursion |
|
Works location: A3218 |
|
|
Works description: This Permit Is For Thames Water, We Will Be Carrying Out 3x25mm Mdpe Metered Supplies In 4 Port Manifold. Works Will Be Taking Place Both In The Carriageway & Footway. |
|
|
Responsibility for works: Thames Water |
|
|
Current status: Planned work about to start |
|
|
|
|
A3220 Gunter Grove, London, Kensington And Chelsea |
20 May — 20 May |
|
|
Delays possible Some carriageway incursion |
|
Works location: A3220 |
|
|
Works description: S81 Planned Cover Replacement--Works Intended To Include First Time Permanent Reinstatement Within Same Phase |
|
|
Responsibility for works: Thames Water |
|
|
Current status: Planned work about to start |
|
|
|
|
B317 North End Road, London, Hammersmith And Fulham |
20 May — 24 May |
|
|
Delays possible Some carriageway incursion |
|
Works location: B317 |
|
|
Works description: Gas Service Disconnection With Excavation Under Our Mandatoryobligation To Comply With The Gas Safety Regulation 1994. Excavate And Disconnect Domestic Gas Supply And Reinstate |
|
|
Responsibility for works: National Grid Gas Plc |
|
|
Current status: Planned work about to start |
|
|
|
|
Carnwath Road, London, Hammersmith And Fulham |
20 May — 03 June |
|
|
Delays possible Traffic control (give & take) |
|
Works location: - |
|
|
Works description: - |
|
|
Responsibility for works: Thames Tideway Tunnel Ltd |
|
|
Current status: Advanced planning |
|
|
|
|
Finborough Road, London, Kensington And Chelsea |
21 May — 21 May |
|
|
Delays possible Some carriageway incursion |
|
Works location: - |
|
|
Works description: - |
|
|
Responsibility for works: Transport For London |
|
|
Current status: Planned work about to start |
|
|
|