Upcoming Roadworks Around Fulham
Traffic delays likely due to lane and road closures in the area
A304 Fulham Road, London, Hammersmith And Fulham |
16 May — 16 May |
|
|
Delays likely Traffic control (multi-way signals) |
|
Works location: A304 |
|
|
Works description: 11/019 - 102680 - Installation Of Magnetomer Studs Under Scoot Contract For Tfl Sd5 Short Stay, 1000-1500, Ne/B Lane 1 Narrowed To Access Mag. Traffic Flow To Be Pushed Over Center Line, Witth Se/B Lane 1 Also Being Narrowed |
|
|
Responsibility for works: Transport For London |
|
|
Current status: Planned work about to start |
|
|
|
|
A308 Waterford Road, London, Hammersmith And Fulham |
16 May — 17 May |
|
|
Delays likely Road closure |
|
Works location: A308 |
|
|
Works description: Safe Access To Underground Bt Footway And Carriageway Boxes For Fibre Cabling And Jointing In Existing Boxes. No Excavation. Required For New Customer Connection |
|
|
Responsibility for works: BT |
|
|
Current status: Planned work about to start |
|
|
|
|
A3219 Munster Road, London, Hammersmith And Fulham |
16 May — 16 May |
|
|
Delays likely Traffic control (Stop/Go boards) |
|
Works location: A3219 |
|
|
Works description: 11/019 - 102680 - Installation Of Magnetomer Studs Under Scoot Contract For Tfl Sd3.4 Short Stay, 1000 - 1500, Se/B Lane 1 Closed |
|
|
Responsibility for works: Transport For London |
|
|
Current status: Planned work about to start |
|
|
|
|
|
|
A308 King'S Road, London, Hammersmith And Fulham |
16 May — 18 May |
|
|
Delays possible Some carriageway incursion |
|
Works location: A308 |
|
|
Works description: Locate And Excavate 1 Blockage In Existing Duct,Locate And Excavate 1 Subsequent Blockage In Existing Duct |
|
|
Responsibility for works: BT |
|
|
Current status: Planned work about to start |
|
|
|
|
A308 New King'S Road, London, Hammersmith And Fulham |
17 May — 19 May |
|
|
Delays possible Some carriageway incursion |
|
Works location: A308 |
|
|
Works description: Service Pipe Repair In Footway. Our Intention Is To Complete Thepermanent Reinstatement In The Same Phase |
|
|
Responsibility for works: Thames Water |
|
|
Current status: Planned work about to start |
|
|
|
|
Breer Street, London, Hammersmith And Fulham |
16 May — 17 May |
|
|
Delays possible Some carriageway incursion |
|
Works location: - |
|
|
Works description: - |
|
|
Responsibility for works: National Grid Gas Plc |
|
|
Current status: Planned work about to start |
|
|
|
|
Carnwath Road, London, Hammersmith And Fulham |
16 May — 18 May |
|
|
Delays possible Traffic control (give & take) |
|
Works location: - |
|
|
Works description: - |
|
|
Responsibility for works: Thames Tideway Tunnel Ltd |
|
|
Current status: Planned work about to start |
|
|
|
|
Halford Road, London, Hammersmith And Fulham |
16 May — 18 May |
|
|
Delays possible Some carriageway incursion |
|
Works location: - |
|
|
Works description: - |
|
|
Responsibility for works: Thames Water |
|
|
Current status: Planned work about to start |
|
|
|
|
Tadema Road, London, Kensington And Chelsea |
17 May — 19 May |
|
|
Delays possible Some carriageway incursion |
|
Works location: - |
|
|
Works description: - |
|
|
Responsibility for works: Thames Water |
|
|
Current status: Planned work about to start |
|
|
|
Information supplied by roadworks.org
|