Upcoming Roadworks Around Fulham


Traffic delays likely due to lane and road closures in the area

A217 Wandsworth Bridge Road, London, Hammersmith And Fulham

22 January — 24 January Traffic control (two-way signals)

Delays likely due to Streetworks
Lay New Domestic Service 6m From Main In Footway at A217

Responsibility: National Grid Gas Plc

EToN status: Planned work about to start

A219 Putney Bridge Approach, London, Hammersmith And Fulham

22 January — 22 January Lane closure

Delays likely due to Streetworks
11/015 Tel60761 - To Replace Magnetometer Sd0:2, 10.00-15.00, Northbound C/W Swapping Lane 1 & 2 And F/W To Chamber (Ped Access Maintained) at A219

Responsibility: Transport For London

EToN status: Planned work about to start

A304 Fulham Broadway, London, Hammersmith And Fulham

22 January — 26 January Traffic control (priority working)

Delays likely due to Streetworks
Install 10m Of 1 Way Poly Duct In Carriageway,Install 5m Of 1 Way Poly Duct In Footway at A304

Responsibility: BT

EToN status: Planned work about to start

A304 Fulham Road, London, Hammersmith And Fulham

22 January — 26 January Traffic control (give & take)

Delays likely due to Streetworks
Valve Stem Replace Unmade F/W & In Carriageway. Our Intention Isto Complete The Permanent Reinstatement In The Same Phase at A304

Responsibility: Thames Water

EToN status: Planned work about to start

A304 Fulham Road, London, Hammersmith And Fulham

23 January — 31 January Traffic control (two-way signals)

Delays likely due to Streetworks
Install 115m Of 1 Way Poly Duct In Footway,Install 52m Of 1 Way Poly Duct In Carriageway at A304

Responsibility: BT

EToN status: Planned work about to start

A3219 Munster Road, London, Hammersmith And Fulham

23 January — 24 January Traffic control (two-way signals)

Delays likely due to Streetworks
Repair To A Damaged Water Main In Carriageway. Our Intention Is Tocomplete The Permanent Reinstatement In The Same Phase at A3219

Responsibility: Thames Water

EToN status: Planned work about to start

A3220 Warwick Road, London, Kensington And Chelsea

23 January — 23 January Road closure

Delays likely due to Streetworks
Crane - Tm: Road Closure Western Arm Of Entry To Warwick Rd From Old Brompton Road, Loading Bay Suspended, Traffic To Enter Warwick Road At Next Junction - Working Hours:0900-1600 - 24h Contact: Yvonne Gadd 07815008512 Or Bob Jones 07976927091 at A3220

Responsibility: Transport For London

EToN status: Planned work about to start

Peterborough Road, London, Hammersmith And Fulham

23 January — 24 January Traffic control (multi-way signals)

Delays likely due to Streetworks
- at -

Responsibility: Thames Water

EToN status: Planned work about to start

 

Information supplied by roadworks.org

 

 

 

Related links
Related Links

Roadworks sign

Live Travel News for Fulham