Upcoming Roadworks Around Fulham
Traffic delays likely due to lane and road closures in the area
|
|
A219 Putney Bridge Approach, London, Hammersmith And Fulham |
22 January — 22 January Lane closure |
|
|
Delays likely due to Streetworks
11/015 Tel60761 - To Replace Magnetometer Sd0:2, 10.00-15.00, Northbound C/W Swapping Lane 1 & 2 And F/W To Chamber (Ped Access Maintained) at A219 |
|
|
Responsibility: Transport For London |
|
|
EToN status: Planned work about to start |
|
|
|
|
|
|
|
A304 Fulham Broadway, London, Hammersmith And Fulham |
22 January — 26 January Traffic control (priority working) |
|
|
Delays likely due to Streetworks
Install 10m Of 1 Way Poly Duct In Carriageway,Install 5m Of 1 Way Poly Duct In Footway at A304 |
|
|
Responsibility: BT |
|
|
EToN status: Planned work about to start |
|
|
|
|
|
|
|
A304 Fulham Road, London, Hammersmith And Fulham |
22 January — 26 January Traffic control (give & take) |
|
|
Delays likely due to Streetworks
Valve Stem Replace Unmade F/W & In Carriageway. Our Intention Isto Complete The Permanent Reinstatement In The Same Phase at A304 |
|
|
Responsibility: Thames Water |
|
|
EToN status: Planned work about to start |
|
|
|
|
|
|
|
A304 Fulham Road, London, Hammersmith And Fulham |
23 January — 31 January Traffic control (two-way signals) |
|
|
Delays likely due to Streetworks
Install 115m Of 1 Way Poly Duct In Footway,Install 52m Of 1 Way Poly Duct In Carriageway at A304 |
|
|
Responsibility: BT |
|
|
EToN status: Planned work about to start |
|
|
|
|
|
|
|
A3219 Munster Road, London, Hammersmith And Fulham |
23 January — 24 January Traffic control (two-way signals) |
|
|
Delays likely due to Streetworks
Repair To A Damaged Water Main In Carriageway. Our Intention Is Tocomplete The Permanent Reinstatement In The Same Phase at A3219 |
|
|
Responsibility: Thames Water |
|
|
EToN status: Planned work about to start |
|
|
|
|
|
|
|
A3220 Warwick Road, London, Kensington And Chelsea |
23 January — 23 January Road closure |
|
|
Delays likely due to Streetworks
Crane - Tm: Road Closure Western Arm Of Entry To Warwick Rd From Old Brompton Road, Loading Bay Suspended, Traffic To Enter Warwick Road At Next Junction - Working Hours:0900-1600 - 24h Contact: Yvonne Gadd 07815008512 Or Bob Jones 07976927091 at A3220 |
|
|
Responsibility: Transport For London |
|
|
EToN status: Planned work about to start |
|
|
|
|
|
|
|
|