Upcoming Roadworks Around Fulham
Traffic delays likely due to lane and road closures in the area
A3218 Lillie Road, London, Hammersmith And Fulham |
30 November — 02 December Traffic control (two-way signals) |
|
|
Delays likely due to Streetworks
This Permit Is For New Water Mains Connection To New Development In F/W And C/W at A3218 |
|
|
Responsibility: Thames Water |
|
|
EToN status: Planned work about to start |
|
|
|
|
|
|
|
A3220 Gunter Grove, London, Kensington And Chelsea |
30 November — 02 December Lane closure |
|
|
Delays likely due to Streetworks
Drainage Remedial Works (Short Duration Works) One One Drain To Be Worked On At A Time Lane 1 / 3 at A3220 |
|
|
Responsibility: Transport For London |
|
|
EToN status: Planned work about to start |
|
|
|
|
|
|
|
|
|
A219 Fulham Palace Road, London, Hammersmith And Fulham |
30 November — 01 December Some carriageway incursion |
|
|
Delays possible due to Streetworks
Repair To A Damaged Boundary Box In Footway. Our Intention Is Tocomplete The Permanent Reinstatement In The Same Phase at A219 |
|
|
Responsibility: Thames Water |
|
|
EToN status: Planned work about to start |
|
|
|
|
|
|
|
A304 Fulham Road, London, Hammersmith And Fulham |
30 November — 30 November Some carriageway incursion |
|
|
Delays possible due to Streetworks
Rhinopatch Remedial at A304 |
|
|
Responsibility: Hammersmith and Fulham London Borough Council |
|
|
EToN status: Planned work about to start |
|
|
|
|
|
|
|
A3219 Dawes Road, London, Hammersmith And Fulham |
30 November — 02 December Some carriageway incursion |
|
|
Delays possible due to Streetworks
Install 3m Of 1 Way Poly Duct In Footway at A3219 |
|
|
Responsibility: BT |
|
|
EToN status: Planned work about to start |
|
|
|
|
|
|
|
A3220 Gunter Grove, London, Kensington And Chelsea |
30 November — 09 December Some carriageway incursion |
|
|
Delays possible due to Streetworks
To Carry Out Trial Holes In The Parking Bays Area Of Caridgeway Andfootway Only, No Lane Incursion. For Gas Medium Pressure Project. at A3220 |
|
|
Responsibility: National Grid Gas Plc |
|
|
EToN status: Planned work about to start |
|
|
|
|
|
|
|
A3220 Gunter Grove, London, Kensington And Chelsea |
30 November — 09 December Some carriageway incursion |
|
|
Delays possible due to Streetworks
To Carry Out Trial Holes In The Parking Bays Area Of Caridgeway Andfootway Only, No Lane Incursion. For Gas Medium Pressure Project. at A3220 |
|
|
Responsibility: National Grid Gas Plc |
|
|
EToN status: Planned work about to start |
|
|
|
|
|
|
|
B317 North End Road, London, Hammersmith And Fulham |
01 December — 03 December Some carriageway incursion |
|
|
Delays possible due to Streetworks
Connections Projects:Disconnection: (Approx Depth 450mm):Excavate And Expose Mains Cable In Public Footpath For Disconnection Of Existing Supply. at B317 |
|
|
Responsibility: UK Power Networks |
|
|
EToN status: Planned work about to start |
|
|
|
|
|
|
|
|
|
|
Information supplied by roadworks.org