Upcoming Roadworks Around Fulham
Traffic delays likely due to lane and road closures in the area
|
|
| A217 Wandsworth Bridge Road, London, Hammersmith And Fulham |
| 02 November — 05 November Some carriageway incursion |
Delays possible due to Streetworks
1x25mm New Water Supply Connection, Footway And In Carriageway. Ourintention Is To Complete The Permanent Reinstatement In The Same Phase at A217 |
| Responsibility: Thames Water |
| EToN status: Planned work about to start |
| |
|
|
| A219 Fulham Palace Road, London, Hammersmith And Fulham |
| 03 November — 05 November Some carriageway incursion |
Delays possible due to Streetworks
Connections Small Service:New Service: (Approx Depth 450mm-600mm):Remedial Reinstatement at A219 |
| Responsibility: UK Power Networks |
| EToN status: Planned work about to start |
| |
|
|
| A3218 Lillie Road, London, Hammersmith And Fulham |
| 02 November — 04 November Some carriageway incursion |
Delays possible due to Streetworks
Rectify Reinstatement Defect In The Footway at A3218 |
| Responsibility: Thames Water |
| EToN status: Planned work about to start |
| |
|
|
| A3218 Lillie Road, London, Hammersmith And Fulham |
| 03 November — 09 November Some carriageway incursion |
Delays possible due to Streetworks
Connections Small Service:Disconnection: (Approx Depth 450mm):Disconnect Existing Supply at A3218 |
| Responsibility: UK Power Networks |
| EToN status: Planned work about to start |
| |
|
|
|
|
|
|
|
|
|
|
|
Information supplied by roadworks.org
|