Roadworks in the Fulham Area
Where to expect traffic delays in the days ahead
|
|
| A308 New King'S Road, London, Hammersmith And Fulham |
| 15 August — 16 August Traffic control (two-way signals) |
Delays likely due to Streetworks
This Permit Is For Thames Water, Which Will Involve Carrying Out Interim To Permanent Reinstatement In The Footway And Carriageway at A308 |
| Responsibility: Thames Water |
| EToN status: Planned work about to start |
|
|
| A3219 Munster Road, London, Hammersmith And Fulham |
| 15 August — 16 August Traffic control (Stop/Go boards) |
Delays likely due to Streetworks
This Permit Is For Thames Water, Which Will Involve Carrying Out Interim To Permanent Reinstatement In The Footway And Carriageway at A3219 |
| Responsibility: Thames Water |
| EToN status: Planned work about to start |
|
|
| A3218 Lillie Road, London, Hammersmith And Fulham |
| 15 August — 15 August Some carriageway incursion |
Delays possible due to Streetworks
Interim To Perm Reinstatement In The Footway at A3218 |
| Responsibility: Thames Water |
| EToN status: Planned work about to start |
|
|
| B317 North End Road, London, Hammersmith And Fulham |
| 14 August — 17 August Some carriageway incursion |
Delays possible due to Streetworks
Rectifiy Reinstatement Defect In Footway. Our Intention Is To Completethe Permanent Reinstatement In The Same Phase at B317 |
| Responsibility: Thames Water |
| EToN status: Planned work about to start |
|
|
| B317 North End Road, London, Hammersmith And Fulham |
| 15 August — 19 August Some carriageway incursion |
Delays possible due to Streetworks
Install 12m Of 1 Way Poly Duct In Footway,Provide 1 Core Drill(S) Into Jointbox Or Building at B317 |
| Responsibility: BT |
| EToN status: Planned work about to start |
|
|
|
Information supplied by roadworks.org
|