Roadworks in the Fulham Area
Where to expect traffic delays in the days ahead
| A3218/B304 Old Brompton Road, London, Kensington And Chelsea |
| 22 June — 22 June Traffic control (two-way signals) |
Delays likely due to Streetworks
S81 Planned Cover Replacement--Works Intended To Include First Time Permanent Reinstatement Within Same Phase at A3218/B304 |
| Responsibility: Thames Water |
| EToN status: Planned work about to start |
|
|
| A304 Fulham Road, London, Hammersmith And Fulham |
| 22 June — 26 June Some carriageway incursion |
Delays possible due to Streetworks
Excavation For Installation 100mm Communications Duct For Cctv On Behalf Of Lbhf at A304 |
| Responsibility: Hammersmith and Fulham London Borough Council |
| EToN status: Planned work about to start |
|
|
| A3219 Munster Road, London, Hammersmith And Fulham |
| 22 June — 28 September Some carriageway incursion |
Delays possible due to Streetworks
Imga160060. Connection Only 10m Into St Olaf'Sroad, In Conjunction Withworks Taking Place In Munster Road. at A3219 |
| Responsibility: National Grid Gas Plc |
| EToN status: Advanced planning |
|
|
|
|
|
|
|
Information supplied by roadworks.org
|