Roadworks in the Fulham Area
Where to expect traffic delays in the days ahead
| A217 Wandsworth Bridge Road, London, Hammersmith And Fulham |
| 09 June — 10 June Lane closure |
Delays likely due to Streetworks
11/045 Tel23950 - Access Pole 4, Green Lamp Out. Cherry Picker Needed As 6m Pole. Work Will Take Approx. 30mins, 22:00-05:00, Ped Access Maintained. at A217 |
| Responsibility: Transport For London |
| EToN status: Planned work about to start |
|
|
|
|
| Ifield Road, London, Kensington And Chelsea |
| 09 June — 11 June Road closure |
Delays likely due to Streetworks
- at - |
| Responsibility: Kensington and Chelsea Royal Borough Council |
| EToN status: Planned work about to start |
|
|
| A304 Fulham Road, London, Hammersmith And Fulham |
| 08 June — 15 June Some carriageway incursion |
Delays possible due to Streetworks
Network Operations Faults:Install / Replace Link Box: (Approx Depth 450mm):High Risk Link Box Replacement. at A304 |
| Responsibility: UK Power Networks |
| EToN status: Planned work about to start |
|
|
| A304 Fulham Road, London, Hammersmith And Fulham |
| 09 June — 11 June Some carriageway incursion |
Delays possible due to Streetworks
1x25mm Mdpe Mtrd Supply Connection In Footway And In Carriageway. Ourintention Is To Complete The Permanent Reinstatement In The Same Phase at A304 |
| Responsibility: Thames Water |
| EToN status: Planned work about to start |
|
|
| A308 New King'S Road, London, Hammersmith And Fulham |
| 09 June — 16 June Some carriageway incursion |
Delays possible due to Streetworks
Network Operations Faults:Install / Replace Link Box: (Approx Depth 450mm):High Risk Link Box Replacement. at A308 |
| Responsibility: UK Power Networks |
| EToN status: Planned work about to start |
|
|
| A3218 Lillie Road, London, Hammersmith And Fulham |
| 08 June — 10 June Some carriageway incursion |
Delays possible due to Streetworks
Connections Small Service:New Service: (Approx Depth 450mm-600mm):Install 100amp Three Phase Supply at A3218 |
| Responsibility: UK Power Networks |
| EToN status: Planned work about to start |
|
|
| A3219 Munster Road, London, Hammersmith And Fulham |
| 08 June — 10 June Some carriageway incursion |
Delays possible due to Streetworks
Customer Side Leakage Supply Pipe Replacement at A3219 |
| Responsibility: Thames Water |
| EToN status: Planned work about to start |
|
|
|
Information supplied by roadworks.org
|