| A219 Fulham High Street, London, Hammersmith And Fulham |
| 26 May — 01 June Traffic control (two-way signals) |
Delays likely due to Streetworks
Disconnect 1 X Mm Pe Service From Main In Footway at A219 |
| Responsibility: National Grid Gas Plc |
| EToN status: Planned work about to start |
|
|
| A304 Fulham Road, London, Hammersmith And Fulham |
| 26 May — 01 June Traffic control (multi-way signals) |
Delays likely due to Streetworks
Network Operations Maintenance:Install / Replace Link Box: (Approx Depth 450mm):Lb No. 130017 - A - Replace A Very Poor Condition Link Box In The Footway. Until The Excavation On A Link Box Is Complete We Are Unaware On Totally What We May Find. If Service Cables Are Found That Could Be To Blocks Of Flats, Businesses Or Houses Then We Need To, By Law Give All Customers 5 Days Notice That Their Electric Supply Will Be Interrupted For Up To 8 Hours. at A304 |
| Responsibility: UK Power Networks |
| EToN status: Planned work about to start |
|
|
| A308 New King'S Road, London, Hammersmith And Fulham |
| 26 May — 01 June Traffic control (multi-way signals) |
Delays likely due to Streetworks
Network Operations Faults:Install / Replace Link Box: (Approx Depth 450mm):North East High Risk Link Box at A308 |
| Responsibility: UK Power Networks |
| EToN status: Planned work about to start |
|
|
| A3218/B304 Old Brompton Road, London, Kensington And Chelsea |
| 27 May — 27 May Traffic control (two-way signals) |
Delays likely due to Streetworks
S81 Planned Cover Replacement--Works Intended To Include First Time Permanent Reinstatement Within Same Phase at A3218/B304 |
| Responsibility: Thames Water |
| EToN status: Planned work about to start |
|
|
| A3218 Lillie Road, London, Hammersmith And Fulham |
| 26 May — 01 June Traffic control (multi-way signals) |
Delays likely due to Streetworks
Network Operations Maintenance:Install / Replace Link Box: (Approx Depth 450mm):Lb No. 130465 - A - Replace A Very Poor Condition Link Box In The Footway. Until The Excavation On A Link Box Is Complete We Are Unaware On Totally What We May Find. If Service Cables Are Found That Could Be To Blocks Of Flats, Businesses Or Houses Then We Need To, By Law Give All Customers 5 Days Notice That Their Electric Supply Will Be Interrupted For Up To 8 Hours. at A3218 |
| Responsibility: UK Power Networks |
| EToN status: Planned work about to start |
|
|
| A3218 Lillie Road, London, Hammersmith And Fulham |
| 27 May — 28 May Traffic control (two-way signals) |
Delays likely due to Streetworks
To Exchange Faulty Pump In Manhole Chamber. No Exc at A3218 |
| Responsibility: Thames Water |
| EToN status: Planned work about to start |
|
|
| A3219 Dawes Road, London, Hammersmith And Fulham |
| 26 May — 29 May Traffic control (multi-way signals) |
Delays likely due to Streetworks
Lay New Domestic Service 2m From Main In Footway at A3219 |
| Responsibility: National Grid Gas Plc |
| EToN status: Planned work about to start |
|
|
|
|
|
|
| B317 North End Road, London, Hammersmith And Fulham |
| 26 May — 31 May Some carriageway incursion |
Delays possible due to Streetworks
Network Operations Faults:Install / Replace Link Box: (Approx Depth 450mm):Nw London High Risk Link Box Replacement at B317 |
| Responsibility: UK Power Networks |
| EToN status: Planned work about to start |
|
|
| B317 North End Road, London, Hammersmith And Fulham |
| 27 May — 31 May Some carriageway incursion |
Delays possible due to Streetworks
Network Operations Faults:Install / Replace Link Box: (Approx Depth 450mm):Nw London High Risk Link Box Replacement at B317 |
| Responsibility: UK Power Networks |
| EToN status: Planned work about to start |
|
|
|
|
|
|
|
|
|
|
|