| A308 New King's Road, London, Hammersmith And Fulham |
| 17 April — 20 April |
| Delays likely Traffic control (multi-way signals) |
| Works location: A308 |
| Works description: Network Operations Maintenance:Install / Replace Link Box: (Approx Depth 450mm):Lb No. 132298 - A - Replace A Very Poor Condition Link Box In The Footway. Until The Excavation On A Link Box Is Complete We Are Unaware On Totally What We May Find. If Service Cables Are Found That Could Be To Blocks Of Flats, Businesses Or Houses Then We Need To, By Law Give All Customers 5 Days Notice That Their Electric Supply Will Be Interrupted For Up To 8 Hours. |
| Responsibility for works: UK Power Networks |
| Current status: Planned work about to start |
|
|
| A308 New King'S Road, London, Hammersmith And Fulham |
| 18 April — 19 April |
| Delays likely Traffic control (two-way signals) |
| Works location: A308 |
| Works description: Repair To A Section 81 Thames Water Valve In Footway. Our Intention Isto Complete The Permanent Reinstatement In The Same Phase |
| Responsibility for works: Thames Water |
| Current status: Planned work about to start |
|
|
| B349 Lower Richmond Road, Putney, London, Wandsworth |
| 18 April — 19 April |
| Delays likely Traffic control (two-way signals) |
| Works location: B349 |
| Works description: New Water Connection 1x25mm Mdpe Mtrd 5'' Ci Main 3m C/W 2mt F/W |
| Responsibility for works: Thames Water |
| Current status: Planned work about to start |
|
|
|
|
|
|
| A308 King'S Road, London, Hammersmith And Fulham |
| 17 April — 20 April |
| Delays possible Some carriageway incursion |
| Works location: A308 |
| Works description: Remedial To Redo Fillet |
| Responsibility for works: BT |
| Current status: Planned work about to start |
|
|
| A308 New King'S Road, London, Hammersmith And Fulham |
| 17 April — 21 April |
| Delays possible Some carriageway incursion |
| Works location: A308 |
| Works description: Remedial Works Following Defect Inspection - To Rectify Failed Fillet In Concrete Fwy With Time Allowed For Curing |
| Responsibility for works: National Grid Gas Plc |
| Current status: Planned work about to start |
|
|
| Greyhound Road, London, Hammersmith And Fulham |
| 18 April — 22 April |
| Delays possible Some carriageway incursion |
| Works location: - |
| Works description: - |
| Responsibility for works: Thames Water |
| Current status: Planned work about to start |
|
|
| Grimston Road, London, Hammersmith And Fulham |
| 17 April — 20 April |
| Delays possible Traffic control (multi-way signals) |
| Works location: - |
| Works description: - |
| Responsibility for works: UK Power Networks |
| Current status: Planned work about to start |
|
|
| Homestead Road, London, Hammersmith And Fulham |
| 17 April — 18 April |
| Delays possible Some carriageway incursion |
| Works location: - |
| Works description: - |
| Responsibility for works: Thames Water |
| Current status: Planned work about to start |
|
|
|