Upcoming Roadworks in Fulham

Where to expect delays and closures in days ahead

 

Related Links

Roadworks sign

Live Travel News for Fulham

Participate

Sign up for our Fulham newsletter

Comment on this story on the

A217 Wandsworth Bridge Road, London, Hammersmith and Fulham
22 March — 26 April
Delays likely Traffic control (Stop/Go boards)
Works location: Unknown
Works description: CONSTRUCTION OF A MINI PUMPING STATION (FLIP) IN THE CARRIAGEWAY AND FOOTWAY
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU287MGJV/FLIPS/214503
A3218 Lillie Road, London, Hammersmith and Fulham
04 April — 04 April
Delays likely Traffic control (Stop/Go boards)
Works location: Unknown
Works description: Thames Water need to carry out works on the water valve. Stop & Go boards will be installed to allow these works to be carried out. Minor Works, No Excavation.
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU150WO-24068669/TW

 

A308,A3217 King's Road, London, Kensington and Chelsea
03 April — 05 April
Delays likely Lane closure
Works location: Unknown
Works description: TRIAL HOLES / DCP TEST
Responsibility for works: Transport for London
Current status: Planned work about to start
Works reference: YG430371861
A308,A3217 King's Road, London, Kensington and Chelsea
04 April — 08 April
Delays likely Traffic control (two-way signals)
Works location: Unknown
Works description: REMOVE BLOCKAGE IN CARRIAGEWAY TO CONNECT CLIENT
Responsibility for works: VIRGIN MEDIA
Current status: Planned work about to start
Works reference: NK100/SCLJFI/115041/LSM




 


 

Information supplied by roadworks.org

Bookmark and Share