Upcoming Roadworks Around Fulham

Traffic delays likely due to lane and road closures in the area

Related Links

Roadworks sign

Live Travel News for Fulham

Participate

Sign up for our free newsletter

Comment on this story on the

A3218 Lillie Road, London, Hammersmith And Fulham

16 January — 17 January Traffic control (two-way signals)

Delays likely due to Streetworks
Repair To A Damaged Water Main In Carriageway. Our Intention Is Tocomplete The Permanent Reinstatement In The Same Phase at A3218

Responsibility: Thames Water

EToN status: Planned work about to start

A304 Fulham Road, London, Hammersmith And Fulham

15 January — 19 January Some carriageway incursion

Delays possible due to Streetworks
Boundary Box Exchange In Footway. Our Intention Is To Complete Thepermanent Reinstatement In The Same Phase at A304

Responsibility: Thames Water

EToN status: Planned work about to start

A304 Fulham Road, London, Hammersmith And Fulham

16 January — 20 January Some carriageway incursion

Delays possible due to Streetworks
Network Operations Faults:Install / Replace Link Box: (Approx Depth 450mm):Nw London High Risk Link Box Replacement 2016 at A304

Responsibility: UK Power Networks

EToN status: Planned work about to start

A3217 King'S Road, London, Kensington And Chelsea

16 January — 19 January Some carriageway incursion

Delays possible due to Streetworks
Clear Blocked Tee & Repair Blockages If Found, Footway Works Only at A3217

Responsibility: Virgin Media

EToN status: Planned work about to start

A3218 Lillie Road, London, Hammersmith And Fulham

15 January — 18 January Some carriageway incursion

Delays possible due to Streetworks
Self Defect Remedial Reinstatement In The Carriageway - Anti Skid Only at A3218

Responsibility: Thames Water

EToN status: Planned work about to start

A3219 Munster Road, London, Hammersmith And Fulham

15 January — 19 January Some carriageway incursion

Delays possible due to Streetworks
Install New Outside Stop Valve In Footway at A3219

Responsibility: Thames Water

EToN status: Planned work about to start

A3219 Munster Road, London, Hammersmith And Fulham

15 January — 19 January Some carriageway incursion

Delays possible due to Streetworks
Remedial Reinstatement In The Carriageway (Construct A New Manhole O/S 228 In The Carriageway To Install An Anti-Flooding Device To Prevent Internal Sewer Flooding To The Property. A Slip Trench Across The Footpath Is Required For An Electricity Cable Connection To The Property.) at A3219

Responsibility: Thames Water

EToN status: Planned work about to start

Bagley'S Lane, London, Hammersmith And Fulham

15 January — 19 January Some carriageway incursion

Delays possible due to Streetworks
- at -

Responsibility: UK Power Networks

EToN status: Planned work about to start

Bramber Road, London, Hammersmith And Fulham

16 January — 19 January Some carriageway incursion

Delays possible due to Streetworks
- at -

Responsibility: Virgin Media

EToN status: Planned work about to start

Edith Grove, London, Kensington And Chelsea

15 January — 16 January Some carriageway incursion

Delays possible due to Streetworks
- at -

Responsibility: Transport For London

EToN status: Planned work about to start

Townmead Road, London, Hammersmith And Fulham

15 January — 18 January Some carriageway incursion

Delays possible due to Streetworks
- at -

Responsibility: BT

EToN status: Planned work about to start

 

Information supplied by roadworks.org