Upcoming Roadworks Around Fulham

Traffic delays likely due to lane and road closures in the area

Related Links

Roadworks sign

Live Travel News for Fulham

Participate

Sign up for our free newsletter

Comment on this story on the

Broomhouse Lane, London, Hammersmith And Fulham

07 December — 07 December Traffic control (two-way signals)

Delays likely due to Streetworks
- at -

Responsibility: Thames Water

EToN status: Planned work about to start

A217 Wandsworth Bridge Road, London, Hammersmith And Fulham

07 December — 09 December Some carriageway incursion

Delays possible due to Streetworks
Perm Repair Sect 72 --On Behalf Of Fire Service at A217

Responsibility: Thames Water

EToN status: Planned work about to start

A219 Fulham Palace Road, London, Hammersmith And Fulham

08 December — 10 December Some carriageway incursion

Delays possible due to Streetworks
Customer Side Leakage Supply Pipe Replacement at A219

Responsibility: Thames Water

EToN status: Planned work about to start

A308/A304 Fulham Road, London, Kensington And Chelsea

07 December — 08 December Some carriageway incursion

Delays possible due to Streetworks
Remedial Ha Defect 2 Day Minor F/W Only Replacing Slabs at A308/A304

Responsibility: BT

EToN status: Planned work about to start

A3218 Lillie Road, London, Hammersmith And Fulham

08 December — 08 December Some carriageway incursion

Delays possible due to Streetworks
Correct Defective Reinstaetement _ Dmt 80514 (Construct A New Manhole O/S 277 In The Carriageway To Install An Anti-Flooding Device To Prevent Internal Sewer Flooding To The Property. A Slip Trench Across The Footpath Is Required For An Electricity Cable Connection To The Property.) at A3218

Responsibility: Thames Water

EToN status: Planned work about to start

A3219 Munster Road, London, Hammersmith And Fulham

08 December — 14 December Traffic control (give & take)

Delays possible due to Streetworks
Disconnect 1 X 25mm Pe Service From Main In Carriageway at A3219

Responsibility: National Grid Gas Plc

EToN status: Planned work about to start

B317 North End Road, London, Hammersmith And Fulham

08 December — 10 December Some carriageway incursion

Delays possible due to Streetworks
Install 3m Of 1 Way Poly Duct In Footway at B317

Responsibility: BT

EToN status: Planned work about to start

Bishop'S Avenue, London, Hammersmith And Fulham

08 December — 10 December Some carriageway incursion

Delays possible due to Streetworks
- at -

Responsibility: Hammersmith and Fulham London Borough Council

EToN status: Planned work about to start

Bishop'S Avenue, London, Hammersmith And Fulham

08 December — 10 December Some carriageway incursion

Delays possible due to Streetworks
- at -

Responsibility: Hammersmith and Fulham London Borough Council

EToN status: Planned work about to start

Bishop'S Road, London, Hammersmith And Fulham

08 December — 10 December Some carriageway incursion

Delays possible due to Streetworks
- at -

Responsibility: Hammersmith and Fulham London Borough Council

EToN status: Planned work about to start

Carnwath Road, London, Hammersmith And Fulham

07 December — 09 December Traffic control (priority working)

Delays possible due to Streetworks
- at -

Responsibility: BT

EToN status: Planned work about to start

Redcliffe Gardens, London, Kensington And Chelsea

07 December — 09 December Some carriageway incursion

Delays possible due to Streetworks
- at -

Responsibility: BT

EToN status: Planned work about to start

Townmead Road, London, Hammersmith And Fulham

08 December — 10 December Some carriageway incursion

Delays possible due to Streetworks
- at -

Responsibility: London Transport

EToN status: Planned work about to start

Vanston Place, London, Hammersmith And Fulham

07 December — 09 December Traffic control (give & take)

Delays possible due to Streetworks
- at -

Responsibility: National Grid Gas Plc

EToN status: Planned work about to start

 

 

Information supplied by roadworks.org