Upcoming Roadworks Around Fulham

Traffic delays likely due to lane and road closures in the area

Related Links

Roadworks sign

Live Travel News for Fulham

Participate

Sign up for our free newsletter

Comment on this story on the

Don't forget, North End Road is closed on Saturday November 28 between Lillie Road and Dawes Road for the first of two traffic-free Christmas markets.

A308 New King's Road, London, Hammersmith And Fulham

28 November — 29 November Traffic control (two-way signals)

Delays likely due to Streetworks
Repair To A Damaged Service Pipe In Footway. Our Intention Is To Complete The Permanent Reinstatement In The Same Phase at A308

Responsibility: Thames Water

EToN status: Planned work about to start

A308 New King's Road, London, Hammersmith And Fulham

28 November — 01 December Traffic control (two-way signals)

Delays likely due to Streetworks
Connections Small Service:New Supply Scheme: (Approx Depth 450mm-600mm):Disconnecting Existing Service at A308

Responsibility: UK Power Networks

EToN status: Planned work about to start

A219 Fulham Palace Road, London, Hammersmith And Fulham

28 November — 02 December Some carriageway incursion

Delays possible due to Streetworks
Install 5m Of 1 Way Poly Duct In Footway at A219

Responsibility: BT

EToN status: Planned work about to start

A3219 Dawes Road, London, Hammersmith And Fulham

27 November — 01 December Some carriageway incursion

Delays possible due to Streetworks
Install 3m Of 1 Way Poly Duct In Footway at A3219

Responsibility: BT

EToN status: Planned work about to start

A3219 Munster Road, London, Hammersmith And Fulham

28 November — 02 December Some carriageway incursion

Delays possible due to Streetworks
Locate And Excavate 3 Blockage In Existing Duct at A3219

Responsibility: BT

EToN status: Planned work about to start

Edith Grove, London, Kensington And Chelsea

27 November — 28 November Some carriageway incursion

Delays possible due to Streetworks
- at -

Responsibility: Transport For London

EToN status: Planned work about to start

Edith Grove, London, Kensington And Chelsea

27 November — 28 November Some carriageway incursion

Delays possible due to Streetworks
- at -

Responsibility: Transport For London

EToN status: Planned work about to start

Edith Grove, London, Kensington And Chelsea

27 November — 28 November Some carriageway incursion

Delays possible due to Streetworks
- at -

Responsibility: Transport For London

EToN status: Planned work about to start

 

Information supplied by roadworks.org

November 23, 2015