Upcoming Roadworks Around Fulham

Traffic delays likely due to lane and road closures in the area

Related Links

Roadworks sign

Live Travel News for Fulham

Participate

Sign up for our free newsletter

Comment on this story on the

A219 Fulham Palace Road, London, Hammersmith And Fulham
04 November — 04 November Traffic control (two-way signals)
Delays likely due to Streetworks
S81 Planned Cover Replacement--Works Intended To Include First Time Permanent Reinstatement Within Same Phase at A219
Responsibility: Thames Water
EToN status: Planned work about to start
Imperial Road, London, Hammersmith And Fulham
05 November — 13 November Traffic control (two-way signals)
Delays likely due to Streetworks
- at -
Responsibility: Thames Water
EToN status: Planned work about to start
A304 Fulham Road, London, Hammersmith And Fulham
05 November — 09 November Some carriageway incursion
Delays possible due to Streetworks
Locate And Excavate 3 Blockage In Existing Duct at A304
Responsibility: BT
EToN status: Planned work about to start
A304 Fulham Road, London, Hammersmith And Fulham
05 November — 09 November Some carriageway incursion
Delays possible due to Streetworks
Locate And Excavate 1 Blockage In Existing Duct at A304
Responsibility: BT
EToN status: Planned work about to start
A3219 Dawes Road, London, Hammersmith And Fulham
05 November — 09 November Some carriageway incursion
Delays possible due to Streetworks
Test 15m Of Existing Ducts To Locate Blockages at A3219
Responsibility: BT
EToN status: Planned work about to start
A3220 Gunter Grove, London, Kensington And Chelsea
04 November — 05 November Some carriageway incursion
Delays possible due to Streetworks
Maintenance: Reset Post- Leaning No Entry Sign Post F/W Works Only (Parking Off Network) at A3220
Responsibility: Transport For London
EToN status: Planned work about to start
Basuto Road, London, Hammersmith And Fulham
05 November — 09 November Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: Hammersmith and Fulham London Borough Council
EToN status: Planned work about to start
Carnwath Road, London, Hammersmith And Fulham
05 November — 09 November Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: Thames Water
EToN status: Planned work about to start
Coniger Road, London, Hammersmith And Fulham
05 November — 05 November Traffic control (Stop/Go boards)
Delays possible due to Streetworks
- at -
Responsibility: Thames Water
EToN status: Planned work about to start
Finlay Street, London, Hammersmith And Fulham
05 November — 09 November Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: Hammersmith and Fulham London Borough Council
EToN status: Planned work about to start
Parsons Green Lane, London, Hammersmith And Fulham
05 November — 09 November Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: Hammersmith and Fulham London Borough Council
EToN status: Planned work about to start
Parsons Green, London, Hammersmith And Fulham
05 November — 09 November Traffic control (priority working)
Delays possible due to Streetworks
- at -
Responsibility: BT
EToN status: Planned work about to start
Redcliffe Gardens, London, Kensington And Chelsea
04 November — 06 November Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: BT
EToN status: Planned work about to start

 

Information supplied by roadworks.org