A304 Fulham Road, London, Hammersmith And Fulham
13 October — 15 October Traffic control (Stop/Go boards)
Delays likely due to Streetworks
11/157 Tel44072 - Slotcut Sd2 Loop, 1000 - 1500, E/B Lane 1 Closed at A304
Responsibility: Transport For London
EToN status: Planned work about to start
A304 Fulham Road, London, Hammersmith And Fulham
13 October — 20 October Traffic control (multi-way signals)
Delays likely due to Streetworks
To Construct Chamber Over 24" Main And Install Gate Valve On Behalf Of Thames Water. Working In The C/W Using Multi Way Signals at A304
Responsibility: Thames Water
EToN status: Planned work about to start
A3218 Lillie Road, London, Hammersmith And Fulham
12 October — 14 October Traffic control (multi-way signals)
Delays likely due to Streetworks
S81 Planned Cover Replacement--Works Intended To Include First Time Permanent Reinstatement Within Same Phase at A3218
Responsibility: Thames Water
EToN status: Planned work about to start
A3218 Lillie Road, London, Hammersmith And Fulham
12 October — 14 October Traffic control (multi-way signals)
Delays likely due to Streetworks
S81 Planned Cover Replacement--Works Intended To Include First Time Permanent Reinstatement Within Same Phase at A3218
Responsibility: Thames Water
EToN status: Planned work about to start
Finborough Road, London, Kensington And Chelsea
12 October — 14 October Lane closure
Delays likely due to Streetworks
- at -
Responsibility: BT
EToN status: Planned work about to start
A304 Fulham Road, London, Hammersmith And Fulham
13 October — 15 October Some carriageway incursion
Delays possible due to Streetworks
Excavation For Installation Of 1 X 100mm Purple Duct For Cctv On Behalf Of Lbhf at A304
Responsibility: Hammersmith and Fulham London Borough Council
EToN status: Planned work about to start
A308 New King'S Road, London, Hammersmith And Fulham
12 October — 18 October Some carriageway incursion
Delays possible due to Streetworks
Network Operations Faults:Install / Replace Link Box: (Approx Depth 450mm):Nw London High Risk Link Box Replacement at A308
Responsibility: UK Power Networks
EToN status: Planned work about to start
A3209 Putney Bridge Road, Wandsworth, London, Wandsworth
12 October — 14 October Some carriageway incursion
Delays possible due to Streetworks
Install 14m Of 1 Way Poly Duct In Footway,Provide 1 Core Drill(S) Into Jointbox Or Building at A3209
Responsibility: BT
EToN status: Planned work about to start
A3219 Dawes Road, London, Hammersmith And Fulham
13 October — 15 October Some carriageway incursion
Delays possible due to Streetworks
W.R.P. - Installation Of Foundations In Preparation For A Bus Stop Post, For And On Behalf Of Transport For London . Bus Stop Number:- 11246 2376546 at A3219
Responsibility: London Transport
EToN status: Planned work about to start
B317 North End Road, London, Hammersmith And Fulham
12 October — 13 October Some carriageway incursion
Delays possible due to Streetworks
Surfacing Carriageway at B317
Responsibility: Hammersmith and Fulham London Borough Council
EToN status: Planned work about to start
Crabtree Lane, London, Hammersmith And Fulham
13 October — 15 October Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: Thames Water
EToN status: Planned work about to start
Finlay Street, London, Hammersmith And Fulham
13 October — 15 October Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: Hammersmith and Fulham London Borough Council
EToN status: Planned work about to start
Hurlingham Road, London, Hammersmith And Fulham
12 October — 14 October Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: Hammersmith and Fulham London Borough Council
EToN status: Planned work about to start
Hurlingham Road, London, Hammersmith And Fulham
12 October — 14 October Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: Hammersmith and Fulham London Borough Council
EToN status: Planned work about to start
Parsons Green, London, Hammersmith And Fulham
13 October — 15 October Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: Thames Water
EToN status: Planned work about to start
Peterborough Road, London, Hammersmith And Fulham
13 October — 15 October Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: BT
EToN status: Planned work about to start

 

 

Information supplied by roadworks.org