A304 Fulham Road

09 September — 22 September Traffic control (two-way signals)

Delays likely due to Streetworks
Construct Chamber Over 24" Main In C/W And Install Gate Valve On Behalf Of Thames Water, Working In C/W Under 2 Way Signals at A304

Responsibility: Thames Water

EToN status: Planned work about to start

A308/A304 Fulham Road

08 September — 10 September Traffic control (two-way signals)

Delays likely due to Streetworks
Install 16m Of 2 Poly Ducts In Carriageway,Install 4m Of 2 Poly Ducts In Footway at A308/A304

Responsibility: BT

EToN status: Planned work about to start

Finborough Road

09 September — 10 September Lane closure

Delays likely due to Streetworks
- at -

Responsibility: Transport For London

EToN status: Planned work about to start

A217 Wandsworth Bridge Road

07 September — 08 September Traffic control (multi-way signals)

Delays likely due to Streetworks
Safe Access To Underground Bt Footway And Carriageway Boxes For Fibre Cabling And Jointing Works In Existing Duct. Required For New Customer Connection at A217

Responsibility: BT

EToN status: Planned work about to start

A217 Wandsworth Bridge Road

07 September — 09 September Traffic control (two-way signals)

Delays likely due to Streetworks
Digimage To Rectify Consequential Damage Footway - Dmt 78396 at A217

Responsibility: Thames Water

EToN status: Planned work about to start

A304 Fulham Road

07 September — 09 September Traffic control (Stop/Go boards)

Delays likely due to Streetworks
Excavate A 450 X 250mm Cctv Duct Across Fulham Road At Junction Of Cassidy Rd. at A304

Responsibility: Hammersmith and Fulham London Borough Council

EToN status: Planned work about to start

A308 New King'S Road

07 September — 08 September Traffic control (multi-way signals)

Delays likely due to Streetworks
Safe Access To Underground Bt Footway And Carriageway Boxes For Fibre Cabling And Jointing Works In Existing Duct. Required For New Customer Connection at A308

Responsibility: BT

EToN status: Planned work about to start

A304 Fulham Road

07 September — 09 September Traffic control (Stop/Go boards)

Delays likely due to Streetworks
Excavate A 450 X 250mm Cctv Duct Across Fulham Road At Junction Of Cassidy Rd. at A304

Responsibility: Hammersmith and Fulham London Borough Council

EToN status: Planned work about to start

Bagley's Lane

07 September — 08 September Traffic control (multi-way signals)

Delays likely due to Streetworks
- at -

Responsibility: BT

EToN status: Planned work about to start

Townmead Road

03 September — 22 October Traffic control (multi-way signals)

Delays likely due to Streetworks
- at -

Responsibility: UK Power Networks

EToN status: Planned work about to start

Mendora Road
27 August — 22 October Road closure
Delays likely due to Streetworks
- at -
Responsibility: Hammersmith and Fulham London Borough Council
EToN status: Advanced planning

 