A217 Wandsworth Bridge Road, London, Hammersmith And Fulham
18 August — 20 August Traffic control (Stop/Go boards)
Delays likely due to Streetworks
Rectify Defect In Carriageway By Digimage - Dmt 77860 at A217
Responsibility: Thames Water
EToN status: Planned work about to start
A219 Fulham Palace Road, London, Hammersmith And Fulham
17 August — 20 August Contra-flow
Delays likely due to Streetworks
District Metering Exchange - Surface C--Works Intended To Include First Time Permanent Reinstatement Within Same Phase at A219
Responsibility: Thames Water
EToN status: Planned work about to start
A308/A304 Fulham Road, London, Kensington And Chelsea
18 August — 20 August Traffic control (two-way signals)
Delays likely due to Streetworks
Install 16m Of 2 Poly Ducts In Carriageway,Install 4m Of 2 Poly Ducts In Footway at A308/A304
Responsibility: BT
EToN status: Planned work about to start
A308/A304 Fulham Road, London, Kensington And Chelsea
18 August — 24 August Traffic control (two-way signals)
Delays likely due to Streetworks
Connections Small Service:New Supply Scheme: (Approx Depth 450mm-600mm):Installing A Three Phase Service at A308/A304
Responsibility: UK Power Networks
EToN status: Planned work about to start
A3218 Lillie Road, London, Hammersmith And Fulham
18 August — 01 September Traffic control (two-way signals)
Delays likely due to Streetworks
Construct A New Manhole O/S 282 In The Carriageway To Install An Anti-Flooding Device To Prevent Internal Sewer Flooding To The Property. A Slip Trench Across The Footpath Is Required For An Electricity Cable Connection To The Property. at A3218
Responsibility: Thames Water
EToN status: Planned work about to start
A3219 Dawes Road, London, Hammersmith And Fulham
17 August — 20 August Traffic control (priority working)
Delays likely due to Streetworks
This Permit Is For Thames Water Which Will Involve Carrying Out 1x32mmmdpe Mtrd Supply, Works In The Footway And Carriageway In Carriageway.Our Intention Is To Complete The Permanent Reinstatement In The Samephase at A3219
Responsibility: Thames Water
EToN status: Planned work about to start
Greyhound Road, London, Hammersmith And Fulham
17 August — 20 August Road closure
Delays likely due to Streetworks
- at -
Responsibility: Thames Water
EToN status: Planned work about to start
Greyhound Road, London, Hammersmith And Fulham
17 August — 20 August Road closure
Delays likely due to Streetworks
- at -
Responsibility: Thames Water
EToN status: Planned work about to start
Townmead Road, London, Hammersmith And Fulham
17 August — 30 August Traffic control (two-way signals)
Delays likely due to Streetworks
- at -
Responsibility: UK Power Networks
EToN status: Planned work about to start
A217 Wandsworth Bridge Road, London, Hammersmith And Fulham
18 August — 20 August Some carriageway incursion
Delays possible due to Streetworks
Digimiage To Rectify Defect In Footway - Dmt 77855 at A217
Responsibility: Thames Water
EToN status: Planned work about to start
A308 Waterford Road, London, Hammersmith And Fulham
17 August — 09 November Some carriageway incursion
Delays possible due to Streetworks
Footway Reconstruction at A308
Responsibility: Hammersmith and Fulham London Borough Council
EToN status: Planned work about to start
B349 Lower Richmond Road, Putney, London, Wandsworth
18 August — 24 August Some carriageway incursion
Delays possible due to Streetworks
Connections Small Service:New Individual Supply::Excavate And Expose Mains Cable For Installation Of A New Supply at B349
Responsibility: UK Power Networks
EToN status: Planned work about to start
Castletown Road, London, Hammersmith And Fulham
18 August — 18 August Traffic control (Stop/Go boards)
Delays possible due to Streetworks
- at -
Responsibility: Thames Water
EToN status: Planned work about to start
Finborough Road, London, Kensington And Chelsea
18 August — 20 August Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: Thames Water
EToN status: Planned work about to start
Tadema Road, London, Kensington And Chelsea
17 August — 19 August Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: Virgin Media
EToN status: Planned work about to start
Townmead Road, London, Hammersmith And Fulham
17 August — 18 August Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: BT
EToN status: Planned work about to start
Townmead Road, London, Hammersmith And Fulham
18 August — 19 August Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: BT
EToN status: Planned work about to start

 