Roadworks in the Fulham Area

Where to expect traffic delays in the days ahead

Related Links

Roadworks sign

Live Travel News for Fulham

Participate

Sign up for our free newsletter

Comment on this story on the

A217 Wandsworth Bridge Road, London, Hammersmith And Fulham
15 July — 16 July Lane closure
Delays likely due to Streetworks
11/045 - Tel003044 - Pole 4 Green Lamp Out - Northbound Lane 3 Only - Partial Lane Closure With Blocker Van For A Period Of 15 Mins Approx. - Ped Access Will Be Maintained - 22:00 - 05:00 at A217
Responsibility: Transport For London
EToN status: Planned work about to start
A3217 King'S Road, London, Kensington And Chelsea
16 July — 20 July Some carriageway incursion
Delays possible due to Streetworks
Remedial Reinstatement In Footway. at A3217
Responsibility: Thames Water
EToN status: Planned work about to start
A3219 Munster Road, London, Hammersmith And Fulham
16 July — 20 July Some carriageway incursion
Delays possible due to Streetworks
B Box Exchange In Footway. Our Intention Is To Complete The Permanentreinstatement In The Same Phase at A3219
Responsibility: Thames Water
EToN status: Planned work about to start
Filmer Road, London, Hammersmith And Fulham
15 July — 16 July Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: BT
EToN status: Planned work about to start
Greyhound Road, London, Hammersmith And Fulham
15 July — 16 July Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: National Grid Gas Plc
EToN status: Planned work about to start
Peterborough Road, London, Hammersmith And Fulham
15 July — 21 July Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: UK Power Networks
EToN status: Planned work about to start
Star Road, London, Hammersmith And Fulham
15 July — 16 July Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: BT
EToN status: Planned work about to start

 

Information supplied by roadworks.org