Roadworks in the Fulham Area

Where to expect traffic delays in the days ahead

Related Links

Roadworks sign

Live Travel News for Fulham

Participate

Sign up for our free newsletter

Comment on this story on the

A217 Wandsworth Bridge Road, London, Hammersmith And Fulham
29 June — 03 July Traffic control (multi-way signals)
Delays likely due to Streetworks
Lay New Domestic Service 2m From Main In Footway at A217
Responsibility: National Grid Gas Plc
EToN status: Planned work about to start
A219 Fulham Palace Road, London, Hammersmith And Fulham
29 June — 01 July Traffic control (multi-way signals)
Delays likely due to Streetworks
S81 Planned Cover Replacement--Works Intended To Include First Time Permanent Reinstatement Within Same Phase at A219
Responsibility: Thames Water
EToN status: Planned work about to start
A219 Fulham Palace Road, London, Hammersmith And Fulham
29 June — 01 July Lane closure
Delays likely due to Streetworks
Rectify Reinstatement Defect In Footway at A219
Responsibility: Thames Water
EToN status: Planned work about to start
A3219 Dawes Road, London, Hammersmith And Fulham
30 June — 02 July Traffic control (two-way signals)
Delays likely due to Streetworks
Exchange A Damaged Ferrule In Carriageway. Our Intention Is To Completethe Permanent Reinstatement In The Same Phase at A3219
Responsibility: Thames Water
EToN status: Planned work about to start
Townmead Road, London, Hammersmith And Fulham
29 June — 27 July Traffic control (two-way signals)
Delays likely due to Streetworks
- at -
Responsibility: UK Power Networks
EToN status: Planned work about to start
A304 Fulham Road, London, Hammersmith And Fulham
29 June — 30 June Some carriageway incursion
Delays possible due to Streetworks
11/019 - Installation Of Cat5 Cable To Rsm Scoot Upgrade, Footpath Access To Poles 2, 4, 5&8 Only. No Incursion On The Carriageway, 1000 - 1500 at A304
Responsibility: Transport For London
EToN status: Planned work about to start
A304 Fulham Road, London, Hammersmith And Fulham
30 June — 01 July Some carriageway incursion
Delays possible due to Streetworks
11/020 - Installation Of Cat5 Cable To Rsm Scoot Upgrade, Footpath Access To Poles 2, 6, 8&9 Only. No Incursion On The Carriageway, 1000 - 1500 at A304
Responsibility: Transport For London
EToN status: Planned work about to start
A3219 Munster Road, London, Hammersmith And Fulham
29 June — 03 July Some carriageway incursion
Delays possible due to Streetworks
Build 2 Precast Chamber 725mm X 255mm X 665mm Deep In Footway,Install 18m Of 1 Way Poly Duct In Footway at A3219
Responsibility: BT
EToN status: Planned work about to start
A3219 Munster Road, London, Hammersmith And Fulham
29 June — 03 July Some carriageway incursion
Delays possible due to Streetworks
Surfacing Carriageway at A3219
Responsibility: Hammersmith and Fulham London Borough Council
EToN status: Advanced planning
A3220 Gunter Grove, London, Kensington And Chelsea
29 June — 30 June Some carriageway incursion
Delays possible due to Streetworks
Maintenance - Repatch - Failed Patch Area 1m Sq Part Lane 1 And Part F/W at A3220
Responsibility: Transport For London
EToN status: Planned work about to start
B317 North End Road, London, Hammersmith And Fulham
29 June — 01 July Some carriageway incursion
Delays possible due to Streetworks
Excavation Of 450mm X 250mm Communications Duct On Behalf Of Ld Hammersmith & Fulham at B317
Responsibility: Hammersmith and Fulham London Borough Council
EToN status: Planned work about to start
Bagley'S Lane, London, Hammersmith And Fulham
29 June — 01 July Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: Hammersmith and Fulham London Borough Council
EToN status: Planned work about to start
Clancarty Road, London, Hammersmith And Fulham
29 June — 30 June Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: National Grid Gas Plc
EToN status: Planned work about to start
Clancarty Road, London, Hammersmith And Fulham
29 June — 30 June Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: National Grid Gas Plc
EToN status: Planned work about to start
Edith Grove, London, Kensington And Chelsea
29 June — 30 June Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: Thames Water
EToN status: Planned work about to start
Strode Road, London, Hammersmith And Fulham
30 June — 02 July Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: Thames Water
EToN status: Planned work about to start

 

 

Information supplied by roadworks.org