Roadworks in the Fulham Area

Where to expect traffic delays in the days ahead

Related Links

Roadworks sign

Live Travel News for Fulham

Participate

Sign up for our free newsletter

Comment on this story on the

A219 Fulham Palace Road, London, Hammersmith And Fulham
26 June — 26 June Traffic control (two-way signals)
Delays likely due to Streetworks
Perm. Repair. Internally Reported Defect at A219
Responsibility: Thames Water
EToN status: Planned work about to start
A3219 Munster Road, London, Hammersmith And Fulham
27 June — 28 June Traffic control (two-way signals)
Delays likely due to Streetworks
Replace 1 Jointbox Frame And Cover(S) (2285mm X 680mm) In Carriageway at A3219
Responsibility: BT
EToN status: Planned work about to start
A219 Fulham High Street, London, Hammersmith And Fulham
27 June — 01 July Some carriageway incursion
Delays possible due to Streetworks
Locate And Excavate 1 Blockage In Existing Duct at A219
Responsibility: BT
EToN status: Planned work about to start
A304 Fulham Road, London, Hammersmith And Fulham
27 June — 28 June Some carriageway incursion
Delays possible due to Streetworks
Excavation For 100mm Comms Duct For Cctv On Behalf Of Lbhf at A304
Responsibility: Hammersmith and Fulham London Borough Council
EToN status: Planned work about to start
Bramber Road, London, Hammersmith And Fulham
26 June — 02 July Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: Fulcrum Pipelines Limited
EToN status: Planned work about to start
Halford Road, London, Hammersmith And Fulham
26 June — 30 June Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: Thames Water
EToN status: Planned work about to start
Redcliffe Gardens, London, Kensington And Chelsea
26 June — 27 June Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: Transport For London
EToN status: Planned work about to start

 

 

Information supplied by roadworks.org