Roadworks in the Fulham Area

Where to expect traffic delays in the days ahead

Related Links

Roadworks sign

Live Travel News for Fulham

Participate

Sign up for our free newsletter

Comment on this story on the

A217 Wandsworth Bridge Road, London, Hammersmith And Fulham
25 April — 25 April
Delays likely Traffic control (Stop/Go boards)
Works location: A217
Works description: Remedial Reinstatement In C/W
Responsibility for works: Thames Water
Current status: Planned work about to start
A304 Fulham Road, London, Hammersmith And Fulham
24 April — 30 April
Delays likely Lane closure
Works location: A304
Works description: Disconnect 1 X 1" Steel And 1 X 25mm Pe Service From Main In Footway
Responsibility for works: National Grid Gas Plc
Current status: Planned work about to start
A3219 Dawes Road, London, Hammersmith And Fulham
25 April — 26 April
Delays likely Traffic control (two-way signals)
Works location: A3219
Works description: Disconnect A Redundant Water Supply In The Footway And Carriageway Incarriageway. Our Intention Is To Complete The Permanent Reinstatement Inthe Same Phase
Responsibility for works: Thames Water
Current status: Planned work about to start
Townmead Road, London, Hammersmith And Fulham
24 April — 28 April
Delays likely Traffic control (Stop/Go boards)
Works location: -
Works description: -
Responsibility for works: UK Power Networks
Current status: Planned work about to start
 
 
Townmead Road, London, Hammersmith And Fulham
25 April — 26 April
Delays likely Traffic control (two-way signals)
Works location: -
Works description: -
Responsibility for works: Thames Water
Current status: Planned work about to start
A304 Fulham Road, London, Hammersmith And Fulham
24 April — 28 April
Delays possible Some carriageway incursion
Works location: A304
Works description: Remedial Works Following Defect Inspection - To Rectify 2x Fillets In Concrete Fwy With Time Allowed For Curing
Responsibility for works: National Grid Gas Plc
Current status: Planned work about to start
A3218 Lillie Road, London, Hammersmith And Fulham
25 April — 26 April
Delays possible Some carriageway incursion
Works location: A3218
Works description: New Water Supply. This Permit Is On Behalf Of Thames Water. Works Will Be Carried Out F/Way. Two Way Lights To Be Used For Traffic Management. Bus Stop Has Been Suspended For Works To Take Place.
Responsibility for works: Thames Water
Current status: Planned work about to start
Broomhouse Road, London, Hammersmith And Fulham
24 April — 30 April
Delays possible Some carriageway incursion
Works location: -
Works description: -
Responsibility for works: National Grid Gas Plc
Current status: Planned work about to start
Finborough Road, London, Kensington And Chelsea
25 April — 25 April
Delays possible Some carriageway incursion
Works location: -
Works description: -
Responsibility for works: Virgin Media
Current status: Planned work about to start

 

Information supplied by roadworks.org