Roadworks in the Fulham Area

Where to expect traffic delays in the days ahead

Related Links

Roadworks sign

Live Travel News for Fulham

Participate

Sign up for our free newsletter

Comment on this story on the

A217 Wandsworth Bridge Road, London, Hammersmith And Fulham
18 April — 18 April
Delays likely Traffic control (Stop/Go boards)
Works location: A217
Works description: Remedial Reinstatement In C/W
Responsibility for works: Thames Water
Current status: Planned work about to start
A308 New King's Road, London, Hammersmith And Fulham
17 April — 20 April
Delays likely Traffic control (multi-way signals)
Works location: A308
Works description: Network Operations Maintenance:Install / Replace Link Box: (Approx Depth 450mm):Lb No. 132298 - A - Replace A Very Poor Condition Link Box In The Footway. Until The Excavation On A Link Box Is Complete We Are Unaware On Totally What We May Find. If Service Cables Are Found That Could Be To Blocks Of Flats, Businesses Or Houses Then We Need To, By Law Give All Customers 5 Days Notice That Their Electric Supply Will Be Interrupted For Up To 8 Hours.
Responsibility for works: UK Power Networks
Current status: Planned work about to start
A308 New King'S Road, London, Hammersmith And Fulham
18 April — 19 April
Delays likely Traffic control (two-way signals)
Works location: A308
Works description: Repair To A Section 81 Thames Water Valve In Footway. Our Intention Isto Complete The Permanent Reinstatement In The Same Phase
Responsibility for works: Thames Water
Current status: Planned work about to start
B349 Lower Richmond Road, Putney, London, Wandsworth
18 April — 19 April
Delays likely Traffic control (two-way signals)
Works location: B349
Works description: New Water Connection 1x25mm Mdpe Mtrd 5'' Ci Main 3m C/W 2mt F/W
Responsibility for works: Thames Water
Current status: Planned work about to start
Charleville Road, London, Hammersmith And Fulham
17 April — 26 April
Delays likely Road closure
Works location: -
Works description: -
Responsibility for works: Vodafone Group
Current status: Planned work about to start
Vereker Road, London, Hammersmith And Fulham
17 April — 26 April
Delays likely Road closure
Works location: -
Works description: -
Responsibility for works: Vodafone Group
Current status: Planned work about to start
A308 King'S Road, London, Hammersmith And Fulham
17 April — 20 April
Delays possible Some carriageway incursion
Works location: A308
Works description: Remedial To Redo Fillet
Responsibility for works: BT
Current status: Planned work about to start
A308 New King'S Road, London, Hammersmith And Fulham
17 April — 21 April
Delays possible Some carriageway incursion
Works location: A308
Works description: Remedial Works Following Defect Inspection - To Rectify Failed Fillet In Concrete Fwy With Time Allowed For Curing
Responsibility for works: National Grid Gas Plc
Current status: Planned work about to start
Greyhound Road, London, Hammersmith And Fulham
18 April — 22 April
Delays possible Some carriageway incursion
Works location: -
Works description: -
Responsibility for works: Thames Water
Current status: Planned work about to start
Grimston Road, London, Hammersmith And Fulham
17 April — 20 April
Delays possible Traffic control (multi-way signals)
Works location: -
Works description: -
Responsibility for works: UK Power Networks
Current status: Planned work about to start
Homestead Road, London, Hammersmith And Fulham
17 April — 18 April
Delays possible Some carriageway incursion
Works location: -
Works description: -
Responsibility for works: Thames Water
Current status: Planned work about to start
Townmead Road, London, Hammersmith And Fulham
17 April — 20 April
Delays possible Some carriageway incursion
Works location: -
Works description: -
Responsibility for works: BT
Current status: Planned work about to start

 

Information supplied by roadworks.org