Roadworks in the Fulham Area

Where to expect traffic delays in the days ahead

Related Links

Roadworks sign

Live Travel News for Fulham

Participate

Sign up for our free newsletter

Comment on this story on the

Roadworks

A304 Fulham Broadway, London, Hammersmith And Fulham
31 January — 31 January
Delays likely Traffic control (Stop/Go boards)
Works location: A304
Works description: 11/081 Tel4863 - Slotcut Sd2, E/B Lane 1 Closed, 0800 - 1300
Responsibility for works: Transport For London
Current status: Planned work about to start
A304 Fulham Broadway, London, Hammersmith And Fulham
31 January — 31 January
Delays likely Contra-flow
Works location: A304
Works description: 11/081 Tel4863 - Slotcut Sd3, O/S 14 In W/B C/W, W/B Lane 1 Closed Slotcut Sd4.5, Opposite 8 In E/B C/W, E/B Lane 2 Closed Switch To Lane 1 0800 - 1300, Traffic Flow Will Be Maintained In W/B C/W By Using E/B Lane 2.
Responsibility for works: Transport For London
Current status: Planned work about to start
A3218 Lillie Road, London, Hammersmith And Fulham
30 January — 30 January
Delays likely Traffic control (Stop/Go boards)
Works location: A3218
Works description: Repair A Damaged Thames Water Network Valve In Carriageway. Ourintention Is To Complete The Permanent Reinstatement In The Same Phase
Responsibility for works: Thames Water
Current status: Planned work about to start
A3219 Munster Road, London, Hammersmith And Fulham
31 January — 01 February
Delays likely Traffic control (two-way signals)
Works location: A3219
Works description: Repair To A Damaged Setvice Pipe In Carriageway. Our Intention Is Tocomplete The Permanent Reinstatement In The Same Phase
Responsibility for works: Thames Water
Current status: Planned work about to start
A308 New King'S Road, London, Hammersmith And Fulham
30 January — 02 February
Delays possible Some carriageway incursion
Works location: A308
Works description: Rectify Reinstatement Defect In The Footway
Responsibility for works: Thames Water
Current status: Planned work about to start
A3218 Lillie Road, London, Hammersmith And Fulham
31 January — 03 February
Delays possible Some carriageway incursion
Works location: A3218
Works description: Repair Patch- Remedial Reinstatement In The Footway
Responsibility for works: Virgin Media
Current status: Planned work about to start
A3219 Dawes Road, London, Hammersmith And Fulham
30 January — 02 February
Delays possible Some carriageway incursion
Works location: A3219
Works description: Rectify Reinstatement Defect In The Footway
Responsibility for works: Thames Water
Current status: Planned work about to start
A3220 Gunter Grove, London, Kensington And Chelsea
30 January — 31 January
Delays possible Some carriageway incursion
Works location: A3220
Works description: Maintenance - 11 Cracked Slabs Part Fw Part Lane 1
Responsibility for works: Transport For London
Current status: Planned work about to start
B318 Harwood Road, London, Hammersmith And Fulham
30 January — 03 February
Delays possible Some carriageway incursion
Works location: B318
Works description: W.R.P. - Installation Of 2 Bay Non Ad Bus Shelter, Back To Kerb, For And On Behalf Of Transport For London 0113/7633/2277082
Responsibility for works: London Transport
Current status: Planned work about to start
Bramber Road, London, Hammersmith And Fulham
31 January — 03 February
Delays possible Some carriageway incursion
Works location: -
Works description: -
Responsibility for works: Virgin Media

 

Information supplied by roadworks.org