Roadworks in the Fulham Area

Where to expect traffic delays in the days ahead

Related Links

Roadworks sign

Live Travel News for Fulham

Participate

Sign up for our free newsletter

Comment on this story on the

Roadworks

A217 Wandsworth Bridge Road, London, Hammersmith And Fulham
28 January — 28 January
Delays likely Traffic control (give & take)
Works location: A217
Works description: Connections Projects:New Individual Supply::A Tm Dummy Run Has Been Requested By The La Before They Allow Us To Carry out The Road Crossing On Wandsworth Bridge Road
Responsibility for works: UK Power Networks
Current status: Planned work about to start
A3218/B304 Old Brompton Road, London, Kensington And Chelsea
29 January — 02 February
Delays likely Traffic control (two-way signals)
Works location: A3218/B304
Works description: S81 Planned Cover Replacement--Works Intended To Include First Time Permanent Reinstatement Within Same Phase
Responsibility for works: Thames Water
Current status: Planned work about to start
A219 Putney High Street, Putney, London, Wandsworth
29 January — 03 February
Delays possible Some carriageway incursion
Works location: A219
Works description: Connections Projects:New Supply Scheme: (Approx Depth 450mm-600mm):Low Voltage Jointing For New Services Situated In Token Yard At Rear Of 79 Putney High Street.
Responsibility for works: UK Power Networks
Current status: Planned work about to start
A3218 Lillie Road, London, Hammersmith And Fulham
28 January — 28 January
Delays possible Some carriageway incursion
Works location: A3218
Works description: Lifting Of Pit Lids In Order To Gain Access To Below Ground Gas Installation To Carry Out Essential Maintenance. No Excavations
Responsibility for works: National Grid Gas Plc
Current status: Planned work about to start
Edith Grove, London, Kensington And Chelsea
28 January — 29 January
Delays possible Some carriageway incursion
Works location: -
Works description: -
Responsibility for works: Transport For London
Current status: Planned work about to start
Peterborough Road, London, Hammersmith And Fulham
29 January — 02 February
Delays possible Some carriageway incursion
Works location: -
Works description: -
Responsibility for works: Thames Water
Current status: Planned work about to start
Townmead Road, London, Hammersmith And Fulham
29 January — 02 February
Delays possible Some carriageway incursion
Works location: -
Works description: -
Responsibility for works: BT
Current status: Planned work about to start
Townmead Road, London, Hammersmith And Fulham
29 January — 02 February
Delays possible Some carriageway incursion
Works location: -
Works description: -
Responsibility for works: BT
Current status: Planned work about to start

 

Information supplied by roadworks.org